Storage

Limondale BESS

Present project

Customer

RWE

Location

Balranald Shire, NSW

Timeframe

2024-2025

Energy Supplied

50 MW / 400 MWh

About

Lumea designed, built, and owns the designated assets required for getting power to and from the grid.

The Designated Network Assets (DNA) comprise:

  • 220/33 kV Limondale Substation, including:
    • One combined 220 kV line and transformer switchbay
    • One 220/33 kV 250 MVA transformer
    • One 33/0.415 kV Auxiliary/Earthing Transformer
    • One 33 kV BESS connection switchbay
    • One 33 kV Harmonic Filter connection switchbay 
    • Secondary services building (SSB)
  • Underground cabling:
    • Approx. 1.1 km of 220 kV single circuit underground cable connecting Limondale substation to Balranald Substation
    • Duplicated 72F single mode underground fibre cable between Balranald substation and the Limondale substation.

Documentation

Lumea Designated Network Asset Access Policy